{"id":683,"date":"2024-02-19T09:54:17","date_gmt":"2024-02-19T01:54:17","guid":{"rendered":"http:\/\/www.hajomech.com\/malaysian-port-commences-3-billion-facility-construction\/"},"modified":"2024-02-19T09:54:17","modified_gmt":"2024-02-19T01:54:17","slug":"malaysian-port-commences-3-billion-facility-construction","status":"publish","type":"post","link":"http:\/\/www.hajomech.com\/malaysian-port-commences-3-billion-facility-construction\/","title":{"rendered":"Malaysian port commences $3 billion facility construction"},"content":{"rendered":"<div style=\"max-width:900px; margin:0 auto; background-color:rgb(246,246,246); padding:20px;line-height:30px\">\n<p><strong>Kuala Linggi International Port (KLIP) in Malaysia has announced <\/p>\n<p>the commencement of construction for its new port facility.<\/strong><\/p>\n<p><img decoding=\"async\" src=\"http:\/\/www.hajomech.com\/wp-content\/uploads\/2026\/10\/1708307532432286-1.jpg\" alt=\"Malaysian port commences $3 billion facility construction\" title=\"Malaysian port commences $3 billion facility construction\" style=\"width: 100%; height: 100%; padding:20px 0px\"\/><\/p>\n<p>The groundbreaking ceremony, held on 8 February, was performed by YAB Datuk <\/p>\n<p>Seri Utama Ab. Rauf Bin Yusoh, Malacca\u2019s Chief Minister, and attended by <\/p>\n<p>dignitaries, government officials, industry leaders, and stakeholders.<\/p>\n<p><\/p>\n<p>KLIP\u2019s objective is to turn Kuala Sungai Linggi into a Green Global <\/p>\n<p>Industrial Hub for Energy, Port, and Maritime Services, with completion expected <\/p>\n<p>in 42 months.<\/p>\n<p><\/p>\n<p>The development plan calls for the building of tank storage, shipyards, <\/p>\n<p>heavy industrial fabrication yards, hard-standing freight handling areas, <\/p>\n<p>wharves, and warehousing facilities for RM15 billion ($3.14 billion).<\/p>\n<p><\/p>\n<p>KLIP also announced the start of the contract granted to China Harbour <\/p>\n<p>Engineering Co Limited (CHEC) for RM760 million ($125 million). The overall cost <\/p>\n<p>of this project is reportedly RM1.39 billion ($291 million) for the 620-acre <\/p>\n<p>island.<\/p>\n<p><\/p>\n<p>KLIP, as a private port, aspires to raise port facility standards by <\/p>\n<p>embracing cutting-edge technology, environmentally friendly practices, and <\/p>\n<p>effective logistical solutions.<\/p>\n<p><\/p>\n<p>In his keynote address, Tan Sri Datuk Seri Dr Noormustafa Kamal Yahya, <\/p>\n<p>Executive Chairman of KLIP, expressed gratitude for the unwavering support from <\/p>\n<p>the Federal and State Government of Malaysia, local communities, and business <\/p>\n<p>partners.<\/p>\n<p><\/p>\n<p>He emphasized KLIP\u2019s commitment to the highest standards of environmental <\/p>\n<p>conservation initiatives and sustainability, aligning with global efforts to <\/p>\n<p>reduce the carbon footprint of maritime operations.<\/p>\n<p><\/p>\n<p>Tan Sri Noor said: \u201cThe groundbreaking ceremony is a historic milestone for <\/p>\n<p>Kuala Linggi International Port \u2013 a significant step forward in our mission to <\/p>\n<p>become a world-class maritime hub.<\/p>\n<p><\/p>\n<p>\u201cWe are not just building a port; we are constructing a symbol of progress, <\/p>\n<p>collaboration, and innovation in the maritime ecosystem that stimulates economic <\/p>\n<p>development and creates opportunities for future generations.\u201d<\/p>\n<p><\/p>\n<p>The facilities will be constructed to accommodate tank storage for liquid <\/p>\n<p>bulk cargoes, liquefied petroleum gas (LPG), and liquefied natural gas (LNG), as <\/p>\n<p>well as specific sections for ship maintenance, repair, and overhaul.<\/p>\n<p><\/p>\n<p>The port intends to integrate sophisticated technology such as renewable <\/p>\n<p>energy, smart logistics systems, and real-time tracking to improve operating <\/p>\n<p>efficiency and cut turnaround times.<\/p>\n<p><\/p>\n<p>KLIP\u2019s development phase, which is scheduled to be completed by 2027, is <\/p>\n<p>expected to catalyse regional economic growth, trade expansion, and technical <\/p>\n<p>innovation.<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kuala Linggi International Port (KLIP) in Malaysia has announced the commencement of construction for its new port facility.The groundbreaking ceremony, held on 8 February, was performed by YAB Datuk Seri Utama Ab. Rauf Bin Yusoh, Malacca\u2019s Chief Minister, and attended by dignitaries, government&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"hj_lang":[3],"class_list":["post-683","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/posts\/683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/comments?post=683"}],"version-history":[{"count":0,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/posts\/683\/revisions"}],"wp:attachment":[{"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/media?parent=683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/categories?post=683"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/tags?post=683"},{"taxonomy":"hj_lang","embeddable":true,"href":"http:\/\/www.hajomech.com\/wp-json\/wp\/v2\/hj_lang?post=683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}